|
An energetic crew added wide expanses of scenery to the layout. What was once a pink foam hill i snow covered in ground foam using diluted white glue and 'wet' water to hold everything in place. |
||
|
This is the tunnel portal on the left side of the layout. The scene is completed with the addition of grass, weeds, and bushes. |
||
|
Once again we're back at the site of the future pond and waterfall. The newly added ground cover frames the nicely carved rocks. It won't be long until water is added. |
||
|
This is the tunnel portal on the back side of the layout. adding the ground foam finishes this part of the layout. |
||
|
The road tunnel has been installed, the low cliffs have been carved and grass added. This area will feature a small depot, merchants row and the team track on the right side. |
||
|
Here's another view of the tunnel portal on the left side of the layout.
|
||
|
|
||
| Return to Rip Track Layout Main Menu | ||
| Return to PWMRC Home |
Photos by Jim Connal |
|